PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing motorized damper controllers at the 2nd floor Facing South.jpg Started connecting copper piping to the 2nd floor  VAV Boxes Facing West (2).jpg Started connecting copper piping to the 2nd floor  VAV Boxes Facing West.jpg Copper piping at the 4th floor Facing East.jpg Exterior metal framing at the 2nd floor Facing North.jpg Installing duct work at the 4th floor Facing North.jpg
Previous pageNext page Exterior metal framing at the 2nd floor Facing North
Exterior metal framing at the 2nd floor Facing North